The company‘s investments are allocated for the following purposes:

  • Reconstruction and development of the transmission grid;
  • Upgrading and development of telecommunications and dispatch control systems;
  • Rehabilitation of hydro power plants (the Kaunas HPP and the Kruonis PSP);
  • Installation of metering systems between transmission and distribution networks;
  • Reconstruction of administration buildings, industrial and other facilities.

Transformer substations under reconstruction (HV side):

  • 110/35/10 kV Ukmergė SS
  • 330/110/10 kV Vilnius SS
  • 110/10 kV Centras SS
  • 110/10 kV Šilkas SS
  • 110/10 kV Noreikiškės SS
  • 110/10 kV Taika SS         
  • 110/10 kV Migla SS
  • 330/110/10 kV Šiauliai SS
  • 110/35/10 kV N.Akmenė SS
  • 110/35/10 kV Šakiai SS
  • 110/35/10 kV Pabradė SS
  • 110/10 kV Ignalina SS
  • 110/10 kV Gargždai SS
  • 110/35/10 kV Kuršėnai SS
  • 110/10 kV Merkinė SS
  • 330/110/10 kV Klaipėda SS
  • 110/10 kV Savitiškis SS

Back Top

© 2004 AB „Lietuvos energija“. Žvejų g. 14, LT-09310 Vilnius. Tel. (8~5) 262 68 22, 278 20 82. Faks. (8~5) 212 67 36. E-mail info@lietuvosenergija.lt. Disclaimer.
Solution: Neosymmetria