Transmission system
Rehabilitation project of Kaunas HPP
Print

 

In compliance with the Single Programming Document (SDP) the project is supported by the Republic of Lithuania The project is partially financed by the EU Regional Development Fund

Kaunas HPP modernisation and rehabilitation is listed in the National Energy Strategy among the measures assigned to ensure the least cost development and operation of the power supply systems as well as to increase the reliability of electricity supply.

The objective of the project is the modernisation of Kaunas HPP by increasing reliability, safety and efficiency of electricity supply to consumers. Support for the project implementation allocated from the European Union structural funds amounts LTL29.2m.

The main targets of the project are as follows: rehabilitation of the hydro power plant, improvement of its control and regulation processes, strengthening of environmental protection. 

In the course of the project implementation, obsolete equipment in the power plant will be replaced by the modern one and a new control system will be installed.  

Upon the rehabilitation of the biggest hydro power plant in the country, electricity supply in Lithuania will become more reliable and safe, the efficiency of operation of the electricity sector will be improved and the potential negative impact on the environment will be decreased:

    • The efficiency of the power plant will be increased by 4 per cent;
    • The reliability of operation of the power plant will be increased three times and the possibility to restore the operation of the power system after a complete blackout will be ensured;
    • The appropriate range and quality of the power plant’s regulation will be ensured;
    • The life time of the power plant will be extended by more than 25 years;
    • The periods between overhauls of the main units will be extended from 5 to 20 years;
    • Replaced turbine runners, bearings and sealings will prevent oil leakage into the Nemunas.

On July 7, 2005 the Contract Agreement for the modernisation and rehabilitation of Kaunas HPP was signed with ALSTOM Power Sweden AB.

The first stage of rehabilitation was completed November 30, 2008.

  •  Units No 3 and No 4

Turbines
- new turbine runner was designed and tested;
-main turbine nodes were manufactured and refurbished – runners, shafts casings of turbine bearings, blade wheels, foot bearings and radial bearings, fastening rings, speed regulation system, cooling and braking systems;  
-runner chambers were installed.

Generators
-windings of stators and rotors inspected, re-wedged, cleaned and tested;
-new excitation and control systems of units installed.

  • General systems

Fire safety system
-fire extinction pump-house was installed;
-a half of fire extinction water supply pipes and water –taps were installed;
-fire fighting system of Units 3 and 4 installed;

Cooling systems
- installation of cooling system for Unit 3 and Unit 4 was completed;

Ventilation system
-  main part of equipment was delivered, installation works finished;
-equipment of ventilation systems supplied and installed.

Lighting
new lighting panels, lighting and power grid in KHPP building installed.

  • Construction works

Interior
-approx. 90 percent of all premises reconstructed;
-new 10 kV and  0.4 kV ,  fire safety and DC panel  rooms were equipped, as well as a room for DC panel for Stage 1. ;
-hydro insulation of cable room was repaired.  

Exterior
-New wings of control room and ventilation were constructed;
-Hydro insulation of machine room ceiling repaired, the road surface and fencing repaired;
-windows replaced and facade of machine room redecorated (approx. 90 per cent);
-hydro insulation of intake roller gates and switch gear rooms repaired.

  • Electric equipment

Two unit transformers of 60MVA each were rehabilitated:
- installed 10kV and 0.4kV swichgears of 1 block, auxiliary transformer No 4 and auxiliary bussbars;
- bussbars and 10kV cables installed between the generators No.3 and No4  and T-2;-protection and control panels manufactured and installed along with hardware and software.

  • Hydro mechanical equipment

- two bridge cranes were rehabilitated;
- four gantry cranes were rehabilitated;
-additional forebay stoplogs were manufactured;
-stoplogs at forebay and afterbay were refurbished;;
-high-pressure equipment at roller gates of units No 3 and No 4 were replaced;
-fencing of spillway reconstructed.

Currently the design works, placement of manufacturing orders for equipment, manufacturing of turbine blade castings are finished. 

Kaunas HPP is the biggest generating source in Lithuania using renewable energy resources for power production. Electricity produced in Kaunas HPP is supplied to 110 kV network. Kaunas HPP is the main power source to be used in the case of black start or after the scheme separation. It is the only power plant in the Lithuanian power system which is capable to solely start operation after the complete blackout of the power system. The capacity of Kaunas HPP makes up approx. 5 per cent from the maximum load in Lithuania, and electricity output produced in this power plant per year covers approx. 3 per cent of a yearly electricity demand in Lithuania.  

Site – Kaunas;

Commencement date -  July 7,  2005;

Project completion date – end of 2009;

Project value - LTL125m;

Value of the EU support -  LTL29.2m.

The funds have been received under General Programming Document "1.2 Ensuring energy stability, access to power supply and higher energy efficiency"

Links:

Ministry of Finance of the Republic of Lithuania
Ministy of Economy of the Republic of Lithuania
European Commission
Lithuanian Business Support Agency

 